Turnkey Conveyor System

DETAILS:

8 - Week Project

  • Turnkey Conveyor System

    • Engineering & Design

    • Controls/PLC/Programming

    • Mechanical & Electrical Installation

• Mezzanine Construction

• Transportation & Accumulation Conveyor, Cross Belt Sortation System

• $1 Million

Inside a warehouse with shelves filled with boxes, empty metal conveyors, a blue automated conveyor system, and two workers using a forklift and sitting on the floor.
Industrial warehouse with conveyor belt, metal safety barriers, and pallets.
An indoor warehouse with a conveyor belt and cardboard boxes, with worker in background.